Sunday, 23 April 2017

Re-Filming in Tunbridge Wells

Shooting Day 3

After looking back at the footage from our day 2 shoot, we realised that some of the clips had some unavoidable problems that needed refilming such as, the fast swish clip, spun round the wrong way, and so in order to get the swish the right way, we had to change the side of the road our actor was running on, which also meant that we had to refilm the joe lee water scene along with the isy ellis traffic light shot. However as we had had practise filming these scenes beforehand, the reshoot went quickly because we knew what to do which increased productivity for the day.

We also had to refilm, the shot with before the lfit, as there was glare on the level one sign meaning you couldnt see Archanas name, however ater quikyl readjusitng the tripod to a better position away from the window this was problem was fixed.
Another thing we decided to film was more running shots, at different angles to add another viewpoint from the side, front and back. This made the whole running part more exciting to watch because of the varied clips. 

Lastly we filmed the point of view shot inside the lift so that we could connect this with another point of view shot which lead to the final scene.



No comments:

Post a Comment